Pre-tensioning is conducted by stressing the positioned tendon prior to concrete casting.
Before the
concrete acquires sufficient strength, the tendons are held by jacking frame.
After the concrete
reaches the strength required, the tendons are released. This is when the
prestressing is achieved, via the tendon-concrete contact interface over the
anchorage length.
Pre-tensioning is mainly used in precast beam.
0 Comments