Prior to stressing, the tendons can be coated with soluble oil, which will be washed off when they are in use.
After placing the
tendons in ducts, the void in duct is filled to remove water and air, and thus
cut the path for moisture to reach the tendons.
The filler can be either cement grout, grease/wax or both.
0 Comments