The contributors of bridge cost are:
- Ground
condition
- Site
location
- Design
- Site
constraints
- Labour
and material costs
To achieve
economic solution:
- Use
reinforced concrete deck for bridge span less than 20m.
- Use
precast prestressed beam for short span with limited access e.g. river or
railway crossing.
Bridge cost is
optimized by taking the balance between deck and substructure costs. For
example, longer span may incur high deck cost (per square meter), but it
reduces the number of piers and thus reduce the substructure cost.
The cost of
external tendons is higher than internal tendons. However, savings can be made
in concrete deck, installation of tendons and finally reduction in construction
period.